App development timeline estimator

This estimator turns your platforms, features, design depth and integrations into weeks for discovery, design, build, QA and store review, laid out as a simple Gantt table. Phase lengths are our planning model, shown beside our own measured build durations, and store review times are quoted from Apple and Google.

Updated

Payment gateway excluded if you ticked payments. Count SMS, email, CRM, analytics and the like.

A customer app plus a driver app is 2.

Estimated time from kick-off to launch

18 weeks

About 4.1 months. Build alone: 11 weeks.

Measured: AskForth (11 weeks)
builtstart of build work → built (the September 2026 billing work closed the build; never deployed). Form-engine library (a hard fork of the MIT-licensed formeo library)
Measured: LeafRanger (12 weeks)
launchingstart of build work → end of the build (Jun–Sep 2026); not yet in an app store. React Native app (Android; iOS in development), 93 screens
Phases as a simple Gantt chart (one block is one week)
PhaseStartsEndsLengthWeeks
Discovery SprintWeek 1Week 22 weeks██················
DesignWeek 3Week 42 weeks··██··············
BuildWeek 4Week 1411 weeks···███████████····
QA and fixesWeek 13Week 163 weeks············████··
Store review and releaseWeek 16Week 182.5 weeks···············███
  • Phase lengths are our planning model, not a promise. The Discovery Sprint turns the build weeks into a plan with milestone dates.
  • Build weeks are a working-pace estimate for a core team; your own review turnaround can add to it. Waiting for content, approvals or third-party accounts is the commonest cause of slips.
  • Apple: "App Review works around the clock, typically reviewing at least 50% of submissions in less than 24 hours and 90% in less than 48 hours." Half a week allows for submission and one round of questions.
  • Google: "This may result in review times of up to seven days or longer in exceptional cases." One week is allowed.

Discovery Sprint: ₹1,50,000 / $1,600

The first 2 weeks above are the Discovery Sprint. They end with a clickable prototype and a fixed-price quote in milestones, so the rest of this timeline gets real dates.

How are the phases of an app timeline estimated?

Build time starts from 4 weeks for one surface with sign-in, a core flow and an API. It adds a week for iPhone and Android from one codebase, three weeks for a web app on top, two for an admin console, two for payments, two for real-time features, a week and a half for maps, half a week for push, a week and a half for an AI feature, half a week per integration and 3 weeks for each extra app. These are our planning numbers.

We calibrate them against the builds in our own timelines. The measured durations there run from start of build work to a stated state, such as 15 weeks for the Pakka platform live or 12 weeks for LeafRanger. Each result shows the two measured projects closest to your build weeks, with the definition each used, since the rows do not all measure the same thing.

Design starts first and the build starts when design is half done. QA is a quarter of the build time, at least one week, overlapping the last build weeks. Store review is added only for mobile and uses Apple's and Google's own stated review times plus a resubmission week.

build = 4 + platform + Σ features + 0.5 × integrations + 3 × (extra apps)
QA = max(1, 25% of build); launch = discovery + design/2 + build + QA/2 + store review

How long did our own builds take?

Measured durations from our case studies (build-timelines dataset, checked 2026-10-20); each row measures a different end point
ProjectDurationMeasured as
AlwaysLoud4 weeksstart of build work → built state at the 17 Oct 2026 build (not deployed, no customers)
QKE5 weeksfirst dated tracker → last dated tracker before the case study (workflow prototype + foundation slices; not deployed)
AskForth11 weeksstart of build work → built (the September 2026 billing work closed the build; never deployed)
LeafRanger12 weeksstart of build work → end of the build (Jun–Sep 2026); not yet in an app store
BogarInfra12 weeksstart of build work → end of the rebuild (site live; the go-live date is not recorded in the case study)
Pakka15 weeksstart of build work → web platform live (full stack in production for the first time)
Damir Pehar portfolio17 weeksstart of build work → last round of requested changes (the first build went up in March 2026)
Tempheraabout 7 monthsJan–Aug 2026 build (start of build work → end of the build), unreleased
Trainr15 monthsstart of build work → handover to the client's incoming developer (13 Aug 2026)

How to estimate your app's timeline

  1. 1
    Choose platforms and featuresPick where the app runs and tick only the features the first release needs. Each tick adds weeks; the table shows which ones.
  2. 2
    Set design depth and discoveryIf designs exist, choose that and the design phase disappears. Keep the Discovery Sprint ticked if the scope is not yet written down.
  3. 3
    Add a start dateOptional. With a date the table shows calendar dates and an expected launch; without one it shows week numbers.
  4. 4
    Read the Gantt table and the store notesCheck the longest phase first, then read the store-review notes, which quote Apple and Google directly.

Frequently asked questions

How long does it take to build an app?
It depends mostly on features, platforms and how many separate apps there are. Our own measured builds range from about 11 to 15 weeks for products with several parts, up to many months for large two-sided products, each measured to a different end point. Use the estimator for your feature set, then confirm with a scoped plan.
How long does Apple take to review an app?
Apple says: "App Review works around the clock, typically reviewing at least 50% of submissions in less than 24 hours and 90% in less than 48 hours." It also warns that an incomplete submission may be delayed or fail review, so the estimator adds half a week, not hours.
How long does Google Play review take?
Google says: "This may result in review times of up to seven days or longer in exceptional cases." For a new personal developer account, Google also requires 12 testers opted in for 14 days of closed testing before production, which adds time before launch.
Why does the timeline start with a Discovery Sprint?
A 2 weeks Discovery Sprint produces the scope, a clickable prototype, the architecture, a risk list and a fixed-price quote in milestones. It is where an estimate such as this one becomes dated milestones.
Can a timeline be shortened by adding more developers?
Only partly. Work that can run in parallel, such as separate apps or an admin console, can be split. Work that depends on decisions, approvals or third-party accounts cannot be. This estimator assumes a small core team at a steady pace.
What delays an app launch the most?
In our experience, waiting on inputs: content, third-party accounts, legal pages, store account verification and review rounds. A rejected store submission costs a resubmission, so the estimate includes a buffer week.

Sources

Related tools

See all 135 free tools

Need a custom dev tool for your team?

We build internal tools, dashboards, APIs, and SaaS platforms. If you can describe it, we can ship it.

Built by CountryDevs · No signup · No ads · We count visits, never what you enter